RMWD Moosa Crest Pipeline Bridge

Kelsey Structural provided the emergency design of the new Moost Crest Pipeline Bridge Crossing for Rainbow Municipal Water District (RMWD) to replace an existing pipeline crossing that was destroyed during heavy rains.  The pipeline crosses over a river with foundations that were scoured out during flooding in early 2017.  The new pipeline and foundations required a quick solution and design as the existing pipe had to be taken out of service and diverted following its collapse.  Design included new concrete bridge abutments, bridge anchorage, and preliminary design of the steel bridge crossing.