Crescent City Washington Tank Retrofit
Kelsey Structural provided the structural retrofit design of the existing 4.15 MG Washington Tank for the City of Crescent City,...
Kelsey Structural provided the structural retrofit design of the existing 4.15 MG Washington Tank for the City of Crescent City,...
Kelsey Structural performed the structural condition assessment of the IWA Plant 2 facilities including two well structures, a booster pump...
Kelsey Structural performed the structural condition assessment, structural and seismic analysis and rehabilitation design of the existing Coronado Water Tank...
Kelsey Structural provided the structural design for the rehabilitation of Padre Dam Municipal Water District’s Grossmont Tank as a subconsultant...
Kelsey Structural provided the structural design and retrofit for the Overland Trail Lift Station Rehabilitation Project for Fallbrook Public Utilities...
Kelsey Structural provided design-build services for the new NAVFAC P-160 Solids Waste Facility. Structural design included pre-engineered building foundations for...
Kelsey Structural provided the structural design and review for a new 2.0 MG Recycled Water Tank for the City of...
Kelsey Structural provided the assessment of 7 AWWA D100 steel reservoirs within the Elsinore Valley Municipal Water District’s (EVMWD) water...