PDMWD Grossmont Tank Rehab

Kelsey Structural provided the structural design for the rehabilitation of Padre Dam Municipal Water District’s Grossmont Tank as a subconsultant as part of their current as-needed contract.  The project included a new elevated catwalk structure with safety cable tie-off system, large hinged access bulkhead door in lower 1.25” thick existing shell, and rehabilitation of multiple access platforms, hatches, ladders and appurtenances.  The tank is a 135’ tall dual-compartment potable water storage tank with maintenance access at 90’ elevation.  The bulkhead door was required for safe access during construction and recoating and was installed while the upper 1.1 MG tank was operational.  Repairs consisted of 1.25” thick A588 plates welded to the existing shell for strengthening due to the large penetration to resist hoop hydrostatic and seismic stresses.  Steel corrosion of the existing catwalk structure warranted the redesign of a new catwalk system with metallic isolation and increased live loading capacity along with a new safety cable tie-off system designed to provide fall protection for District employees during maintenance.  The upper access platform had sustained significant corrosion and large patch plates, support beams, and hatch supports were repaired as part of the design.  This project included many unique challenges including extensive scaffolding, coating and construction sequencing and accessibility considerations.  During construction, continuous coordination with the contractor was required for assessment and repair of areas that were not accessible during design along with communication and expedited submittal reviews to facilitate the rapid schedule