EMWD TVRWRF Air Line Replacement
Kelsey Structural provided the structural design-build services for a series of aeration pipe supports at the existing Eastern Municipal Water District’s Temecula Valley Regional Water Reclamation Facility. Design included various pipe supports for 36” and 18” diameter stainless steel air piping including ground-mounted stanchions, kicker supports to existing Aeration Basins and Primary Clarifiers and a 32’ long pipe bridge spanning over an existing access road. Design considerations for expansion couplers, large thrust loads, existing structure loading and poor soils at the site required detailed coordination with the client and contractor.