P-160 Solid Waste Management Facility

Kelsey Structural provided design-build services for the new NAVFAC P-160 Solids Waste Facility. Structural design included pre-engineered building foundations for both a 40,000 sqft Solid Waste Management building with covered canopy area and a 966 sqft Maintenance building. Additional design included a Wastewater Treatment Facility, Steel Fire Storage Tank and Pump House, debris fence, various site equipment foundations with anchorage design and influent splitter box/sumps/vaults. The project required the use of BIM modeling using Revit 3D.