Posts by admin

Crescent City Washington Tank Retrofit

Kelsey Structural provided the structural retrofit design of the existing 4.15 MG Washington Tank for the City of Crescent City,...

IWA Plant 2 Condition Assessment

IWA Plant 2 Condition Assessment

Kelsey Structural performed the structural condition assessment of the IWA Plant 2 facilities including two well structures, a booster pump...

NAVFAC Repair Water Tank 1021

Kelsey Structural performed the structural condition assessment, structural and seismic analysis and rehabilitation design of the existing Coronado Water Tank...

PDMWD Grossmont Tank Rehab

PDMWD Grossmont Tank Rehab

Kelsey Structural provided the structural design for the rehabilitation of Padre Dam Municipal Water District’s Grossmont Tank as a subconsultant...

Fallbrook Overland Trail Lift Station

Fallbrook Overland Trail Lift Station

Kelsey Structural provided the structural design and retrofit for the Overland Trail Lift Station Rehabilitation Project for Fallbrook Public Utilities...

1 2 3 5